One of the challenges we face today is the need to increase available energy while lowering carbon dioxide output levels. World population has more than doubled since the 1950s, and the quest for alternative, viable energy sources continues to emerge with headlining importance. STRATA not only invests and participates in the success of energy-related projects and solutions, but practices its own conservation and environmentally sustaining practices for the health of its employees, communities, and the planet.

Wygen Power Plants
  • Project Name: Wygen Power Plants
  • Location: Gillette, WY
  • Client: Black Hills Power & Light
  • Project Cost: $500 M
  • Duration: 1993-2010
  • Value Added: Through dynamic pile analysis and foundation evaluation and design, STRATA personnel saved the contractor millions of dollars in construction.

Related Servies

Dry Fork Station
  • Project Name: Dry Fork Station
  • Location: Gillette, WY
  • Client: Basin Electric Power Cooperative
  • Project Cost: $1.3 Billion
  • Duration: 2007 - 2011
  • Value Added: Provided complete array of services from geotechnical engineering to quality control management.

Related Servies

Airport Generation Facility
  • Project Name: Airport Generation Facility
  • Location: Pueblo, CO
  • Client: Black Hills/Colorado Electric Utility
  • Project Cost: $500 Million
  • Duration: 2010
  • Value Added: Based on our engineering recommendations, reduced amount of piles needed for foundation.

Related Servies

Populus to Terminal 345 kV Transmission Line Project
  • Project Name: Populus to Terminal 345 kV Transmission Line Project
  • Location: From Salt Lake City Terminal Substation to Downey, Idaho Substation
  • Client: Kiewit
  • Project Cost: $800 Million
  • Duration: 2009-2010
  • Value Added: Consistency, Reliability, Flexible Scheduling and Stand-by Availability, Provided Valuable Additional Resources.